Categories | Engineering Drilling Rig |
---|---|
Brand Name: | JCDRILLS |
Model Number: | AK30 |
Certification: | ISO,CE |
Place of Origin: | Hebei,China |
MOQ: | 1Set |
Price: | Negotation |
Payment Terms: | T/T, L/C, D/P, Western Union, MoneyGram |
Supply Ability: | 2000Set/Year |
Delivery Time: | In stock |
Packaging Details: | Standard export transportation package |
Drill Rock Hardness: | F=6-20 |
Type: | Rotary Drilling Rig |
Usage: | Anchor Drilling,construction |
Drilling Depth: | 30m |
Drilling Diameter: | 90-150mm |
Air Consumption: | 16-40m3/min |
Drilling Pipe Length: | 1500mm |
Hole Angle Range: | 0-360° |
Rotary Speed: | 30-60 R/min |
Rotary Torque: | 1500N.m |
Voltage: | 12V |
Power: | 12kw |
Weight: | 85Kgs |
Diesel Engine / Electric Motor Powered Anchor Drilling Machine for 30m Engineering Drilling Depth
Diesel engine&electric motor drive available
Application
AK30 construction Anchor Drilling rig is a full hydraulic operated top drive power head drill. This engineering drilling rig is used to drill heavy duty pretension anchor hole at side slope of water power station, railway or highway projects, as well as drainage holes. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. In addition, it is also used to drill small size water well and high- pressure jet grouting hole. Rig is already widely used in various projects such as water power stations situated in Yunnan, Guangxi, Sichuan, Guizhou and Hubei provinces, and expressways as well such as Ninbo-Taizhou-Wenzhou (in Zhejiang), Huangshan-Hangzhou (in Zhejiang), Dali-Baoshan (in Yunnan).It has become the first priority for medium-duty anchoring-reinforcing projects in China.
AK30 construction Anchor Drilling rig is used for drilling anchor
holes in deep base pit of high building, anchor and reinforce
side-slope for water conservatory project, water power station
project, railways and highways . Especially used for drilling
anchor holes in high position side-slope protection and drainage
holes.
Characteristics
1. AK30 engineering drilling rig is a full hydraulic operated top drive power head drill with strong drilling capability and low energy consumption.
2. It is composed of the main set, control panel and pump which are connected together with flexible joint. So it features simple in structure, good disassembility and convenient to mount and transport.
3. Transmission, built in the top drive power head, has two speed range ― high and low. It can meet the requirements of both DTH hammer drilling and carbide bit drilling.
4. Hydraulic part is an international famous brand product which ensures drilling rig's high reliability and permanence stability.
Specification
Drilling Capacity | AK30(Engine Power) | AK30E(Electric Power) |
Type | Hydraulic(4part) | Hydraulic(4part) |
Hole depth | 30-40 m | 30-40 m |
Hole diameter | 80-130 mm | 80-130 mm |
Drilling rod(Diameter×Length ) | 76mm*1500m/89×1500 mm | 76mm*1500m/89×1500 mm |
Hole angle range | 0-360° | 0-360° |
Output speed of top drive power head (forward and reverse) | 24 -114 r/min | 24 -114 r/min |
Output torque of top drive power head | 1500 Nm | 1500 Nm |
Feeding stroke of top drive power head | 1800 mm | 1800 mm |
Mast slide stroke | 500 mm | 500 mm |
Maximum lifting capacity of top drive power head | 30 kN | 30 kN |
Maximum thrust force of top drive power head | 15 kN | 15 kN |
Rated pressure of hydraulic system | 18 Mpa | 18 Mpa |
Drilling guide type | Chain wheel feed | Chain wheel feed |
Hydraulic Clamp | Available | Available |
Engine/Motor | Yanmar Or Changchai | |
Type | Four-stroke/water-cooled | Electric Motor |
Model | 4TNV88-SYY | |
Power | 23 kW | 15 kW |
Working Speed | 2200rpm | |
Weight | 170kgs | |
Hydraulic system | Germany Rexroth Technology | |
Type | Gear pump(3 union pump) | |
Flow rate | 16/12/5L/min | |
Pressure | 18MPa |
Packing& Delivery
Service
In our after sales service system, We establish perfect control system strictly according to ISO-9000 series, in this system, technology date and problem solve solution and preventive measures will be provided in any maintain project, all the spare parts will be used in new OEM products with installation instructions, packing list, manufacturer's instruction, qualification and Warranty certificate