Categories | Valve Pusher |
---|---|
Brand Name: | OUB |
Model Number: | ZAX110 ZAX120 |
Certification: | ISO9001 |
Place of Origin: | Guangdong, China |
MOQ: | 10 Pcs/Accept trial order |
Price: | Negotiable |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 1000PCS+5DAY |
Delivery Time: | Within 5-15 days after getting your desposit |
Packaging Details: | PP Bag Inside,Carton Box Outside |
Condition: | New |
After Warranty Service: | No service |
Warranty: | Unavailable |
Product name: | HYDRAULIC SEAL KIT |
After-sales Service Provided: | Video technical support, Online support |
High Quality Hydraulic Pilot Valve Joystick Pusher for ZAX110 ZAX120 Excavator Spare Parts
Product Name | Valve Pusher ZAX110 ZAX120 OIL SEAL |
Brand | OUB |
Material | NBR |
MOQ | 10 Pcs/Accept trial order |
Sample | Provided,Avaliable |
Usage | Wheelloader Komatsu parts |
Feature | Oil Resistance, Heat Resistance, Durable, Sealing Performance, Manufacture |
Loading Port | Huangpu port,China |
Original Place | Guangdong provice,China |
Transport Ways | By air, by sea, by express ( FedEx , UPS,DHL,TNT etc.) |
Oem | Available |
Appliacation | Manufacturing Plant, Machinery Repair Shops, farms, Retail,Construction work,Enegy&Mining |
Shipping Weight (kg) | 0.2359 |
Delivery Time | Within 5-15 days after getting your desposit |
Reference picture content
Company Profile
We are professionally engaged in excavator sealing parts and sealing repair kit, with 10-year of experience. And also we are one of the TOP10 GOLD seals supplier of alibaba.com. We can offer you factory direct price, nice quality, quick shipping within 5 days, small order service.
FAQ
Q1: Can you send me the sample?
A1: Yes. Paid sample & freight collect
Q2: When will you ship my order?
A2: Within 3-5 days after payment if in stock.
Q3: How long can i receive the goods?
A3: The normal deliver time is 3- 9 days, depending on the
transport mode.
Q4: Quality of the products have a guarantee?
A4: The products we sell would go through strict testing at the
factory prior.
Q5: Can the price be cheaper?
A5: The more quantity, the lower price
![]() |